此页面上的内容需要较新版本的 Adobe Flash Player。

获取 Adobe Flash Player

POWERCHINA Kunming Signs Agreement on Design and Technical Services for Nam Ngum 4 Hydropower Project
 

On July 13, 2016, Zou Lichun, Deputy General Manager of POWERCHINA Kunming, and Zhou RenFei, Vice President of the second business unit of China National Heavy Machinery Corporation, signed the Agreement on Design and Technical Services for Nam Ngum 4 Hydropower Project in Laos. Feng Junlin, General Manager of POWERCHINA Kunming, and Jin Renzhe, Deputy General Manager of China National Heavy Machinery Corporation, witnessed the signing ceremony.

Nam Ngum 4 Hydropower Station is located in the upper reaches of Nam Ngum River in Laos. It is developed in a mixed mode with an installed capacity of 240 MW. Its head works consists of a roller compacted concrete dam, an overflow surface outlet, a flushing orifice and a stilling basin. The diversion and generation system includes an intake, a diversion tunnel, a surge shaft, a steel penstock and a ground powerhouse.

       The conclusion of the agreement is a fruit of POWERCHINA Kunming's strategy under China's Belt and Road Initiative to consolidate and further explore Lao market, and to provide initiative and preferential service to highly-internationalized and strong engineering enterprises.

XML 地图 | Sitemap 地图