此页面上的内容需要较新版本的 Adobe Flash Player。

获取 Adobe Flash Player

Nuozhadu Hydropower Station Passes Hydraulic Complex Acceptance Inspection
 

On May 18, 2016, Nuozhadu Hydropower Station passed the hydraulic complex acceptance inspection organized by the Yunnan Development and Reform Commission in Kunming city.

Located in the lower reaches of Lancang River, Nuozhadu Hydropower Station is the fifth of the eight cascades in the middle and lower reaches of Lancang River. The station has nine units with capacity of 650,000 kW and its total installed capacity is 5,850,000 kW. As the biggest hydropower station in Yunnan province, it is the main force for "West to East Power Transmission Project" and "Power Transmission from Yunnan Province". Featured with large capacity, strong regulation performance and obvious regional advantage, it is of great significance to optimizing power source structure and realizing clean development.

XML 地图 | Sitemap 地图